The most recent photos are listed first. See also photomap view.
This listing only shows photos within Renfrewshire.
Go to the national CycleStreets photo listings for photos beyond.
The shared footway alongside the A8 approaches the bridges across the Black Cart, and cyclists are directed to cross at the toucan crossing to use the new cycle bridge. A green strip has been provided on the road, with a cycle symbol, but … [more]
The shared footway alongside the A8 becomes at segregated footway and cycleway at Inchinnan bus garage, with the cycleway transferring onto the traffic island to avoid the entrance to the bus garage.
The shared footway alongside the A8 at the Inchinnan Industrial Estate roundabout. The path has a direct route past the roundabout.
The shared footway alongside the A8, approaching Inchinnan. This field access did not have a dropped kerb, unlike the previous one at #194991.
The A8 shared footway crosses the A726 at the Red Smiddy Roundabout. Nothing more than a dropped kerb crossing has been provided. No footways, shared or otherwise, are provided along this section of the A726.
The shared footway alongside the A8 between Bishopton and Renfrew, passing a farm. This had quite a bit of grit on the footway and could do with a sweep.
The shared footway alongside the A8 heading away from the new M8 junction. The shared footway on the opposite side comes to an end and a dropped kerb crossing is provided. There is also a slip for joining that shared footway from the … [more]
The shared footway of the A8 crossing over the M8 motorway. The bridge parapets seemed surprisingly low, considering this is used as an excuse for 'Cyclists Dismount' signs at many locations.
This section of the A8 between Bishopton and Renfrew has shared footways on both sides, around and between the various roundabouts associated with Dargavel, which, if nothing else, means a choice of crossing locations if traffic happens to … [more]
The dual provision of Barrangary Road ends at the Barrangary Roundabout, with the on-road cycle lane feeding into the shared footway.
The shared footway along Barrangary Road continues, and a cycle lane starts on the road. A dropped kerb is provided to transfer between the two. A 30mph reminder sign has been provided on a lamppost, immediately beyond the 30mph … [more]
Shared footway along Barrangary Road. Parking spaces have been marked intermittently along the main road.
A shared footway along Barrangary Road in Dargavel, at the Sainsbury's supermarket. A raised kerb appears to have been installed for a bus stop, but the buses would stop in the zig-zag zone of the adjacent zebra crossing.
The path from Abbotsinch Road to Inchinnan Road at the bascule bridge. The cycleway effectively ends at the bridge and it's onto the road for Renfrew and Glasgow, although a riverside path route starts on the other side of the river that … [more]
A split toucan crossing across Abbotsinch Road to cross to the path to the bascule bridge on Inchinnan Road.
The Barnwell Street Bridge has been open since August 2022, and has a shared-use footway on the southern side. There is very little traffic on the road since it serves only a handful of industrial premises in what used to be the end of … [more]
The Hillington Park cycle route shared footway is on this side of the road, but the footway across the road now has a dividing line along it. Unlike #170674, the crossing is shared for both walking and cycling, and features a right-angle … [more]
The Hillington Park cycle route shared footway is on this side of the road, but the footway across the road now has a dividing line along it. Separate cycle and pedestrian crossings have been provided.
The Hillington Park cycle route shared footway is on this side of the road, but the footway across the road now has a dividing line along it.
The cycle route through Robertson Park does not connect to anything outside the park. At this side it is the A8 Inchinnan Road.
The riverside path in Renfrew, alongside the River Cart. The concrete panels give way to asphalt for the rest of the path's length to Inchinnan Road.
The surface of the riverside path changes from asphalt to concrete panels. One or two of them are slightly out of alignment here and there, although not a serious problem.
The end of the protected cycle track over the Erskine Bridge. The choice is going down the ramp to the main road below, or continuing through the former toll plaza to get to the same place via the slip-road and roundabout. But no dropped … [more]
The shared-use footway from Dargavel approaching the Barrangary Roundabout. The A8 currently doesn't have any cycle infrastructure on it in either direction from here. Although the sign says 'road on right closed', the road to the left was … [more]
A shared-use footway along one side of Barrangary Road. Strictly speaking, there shouldn't be 30mph signs here since the road has street lighting.
Could make a bus stop bypass here... Or home for a cup of tea? At Braehead, Glasgow. https://t.co/K0iXbWqoxl
A segregated cycle lane at Saucel Street that doesn't connect up with the main road (behind camera).
Shared use footway route crossing car-park entrance, with none of the signage or 'give way' markings or found at other crossings