Tags: cyclelane
You may also be interested in the automatic categorisation listings and themed galleries.
The dual provision of Barrangary Road ends at the Barrangary Roundabout, with the on-road cycle lane feeding into the shared footway.
Barrangary Road approaching the Barrangary Roundabout.
The shared footway along Barrangary Road continues, and a cycle lane starts on the road. A dropped kerb is provided to transfer between the two.
A 30mph reminder sign has been provided on a lamppost, immediately beyond the 30mph
* Items marked with an asterisk [*] are required fields and must be fully completed.