Donate using PayPal

Tags: bollards

You may also be interested in the automatic categorisation listings and themed galleries.

This listing only shows photos within Renfrewshire.
Go to the national CycleStreets photo listings for photos beyond.

The path from the new bridge across the Black Cart Water continues for a short distance on this side of the A8 before crossing to the other side where it continues all the way to the edge of Bishopton.

The path from Abbotsinch Road to Inchinnan Road at the bascule bridge. The cycleway effectively ends at the bridge and it's onto the road for Renfrew and Glasgow, although a riverside path route starts on the other side of the river that … [more]

The new bridge across the Black Cart Water, alongside the busy A8 Greenock Road.

Discriminatory blocking of the route to the Arkleston bridge across the M8 motorway, with tyres being placed over the bollards, narrowing the gaps between them considerably.

The path from the footbridge joins Arkleston Road without further barriers.

A nasty roundabout to cross to get from the Hillington Road industrial estate side road to the residential part of Hillington.

The cycle crossing waiting area on Abbotsinch Road. See also #170247.

A closer look at the cycle crossing waiting area on Abbbotsinch Road.

It is without explanation, but I believe the thing on the left is to allow cyclists to pull in and wait to cross to the shared footway on the right. See also #170247. The ban on right turns presumably didn't take into account the route of … [more]

Clear access to the path to the southern part of Dargavel, but why does the asphalt not continue?

Think I interrupted a dance off between these bollards... https://t.co/mZ9zk2HLwA Similar in Cambridge see: #9156

The path alongside the roadway continues through to Irvine Drive.

'No Vehicles Except for Access' sign prohibiting through use of this section of Old Greenock Road by cyclists. Must go via A8 instead.

Road closure on Old Greenock Road, with plenty of space for cycles, but see #52442

Current end of Paisley to Barrhead cycle path. Handy for the bus stop. Roughly midway between Paisley and Barrhead. UPDATE June 2014: The path to Barrhead has now opened. http://www.eastrenfrewshire.gov.uk/index.aspx?articleid=5142 … [more]

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://renfrewshire.cyclestreets.net/photomap/tags/bollards/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.