Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | cambridge, cb2, station |
Date time: | 11.00am, Tuesday 25th April, 2017 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
Well, well... the morning after I posted #89287 asking where the north-south cycle route was, a section of kerb was being removed to instal a dropped kerb (presumably).
Comments reflect the views of the original submitter only.