Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | bridge, footbridge, m8motorway, motorway, ramp |
Date time: | 1.46pm, Sunday 5th February, 2017 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
Other than the barriers in #87543, a good job has been made of the replacement footbridge at Hillington.
Comments reflect the views of the original submitter only.