Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | crossing, ramp, shareduse, steps, toucan |
Date time: | 11.29am, Sunday 6th September, 2015 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
A ramp and steps up to the Greenock Road toucan crossing.
Comments reflect the views of the original submitter only.