Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | bridge, footbridge, hillington, m8motorway, motorway, replacement |
Date time: | 11.02am, Sunday 6th September, 2015 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
The replacement for the damaged Hillington Footbridge is still not in place. It's meant to be opening this month!
www.transportscotland.gov.uk/project/m8-hillington-footbridge-replacement
UPDATE: This timelapse sequence shows the bridge being moved into place: youtu.be/i9ttiHnfsfA
Comments reflect the views of the original submitter only.