Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | piriapolis, uruguay |
Date time: | 2.39pm, Saturday 26th January, 2013 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Start of cycle track right at the urban limit of Piriapolis
Comments reflect the views of the original submitter only.