Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | folkestoneharbour, kent |
Date time: | 9.15am, Sunday 27th March, 2022 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Folkestone |
One-way system on the former Folkestone Harbour railway bridge - and Lift Out of Order sign, so cyclists will have to come back here.
Comments reflect the views of the original submitter only.