Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | a81, bollards, connectingwoodside, cycletrack, garscuberoad, hybrid, incomplete, segregation, stepped, surface, tactiles, underconstruction |
Date time: | 11.54am, Wednesday 3rd March, 2021 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The southern end of the Garscube Road cycle track still hasn't been completed, but is at least now rideable. Top surface is all that is required. Further north, the path is complete up until Sawmillfield Street, with work in progress at the Possil Road junction. The tacile paving is of the correct type.
Comments reflect the views of the original submitter only.