Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | crossing, entrance, ncn7, ncn75, path, removal |
Date time: | 12.17pm, Friday 29th November, 2019 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
The previous barriers have been removed from the path alongside Ben Nevis Road.
Comments reflect the views of the original submitter only.