Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | a898, bridge, endofcycleroute, endofroute, erskinebridge, kerb, ramp |
Date time: | 4.32pm, Sunday 4th August, 2019 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
The end of the protected cycle track over the Erskine Bridge. The choice is going down the ramp to the main road below, or continuing through the former toll plaza to get to the same place via the slip-road and roundabout. But no dropped kerb at the end of the ramp.
Comments reflect the views of the original submitter only.