Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | 40mph, a8renfrew, footway, roadclosed, roadworks, roundabout, shareduse |
Date time: | 4.04pm, Sunday 4th August, 2019 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
The A8 carriageway shut at the Barrangary Roundabout for various works. The roadworks on the Bishopton side were passable with care for pedestrians and cyclists.
Comments reflect the views of the original submitter only.