Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | 40mph, footway, roundabout, shareduse |
Date time: | 4.03pm, Sunday 4th August, 2019 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
The shared-use footway from Dargavel approaching the Barrangary Roundabout. The A8 currently doesn't have any cycle infrastructure on it in either direction from here.
Although the sign says 'road on right closed', the road to the left was also closed.
Comments reflect the views of the original submitter only.