Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | hill, path, soggy, steep, surface |
Date time: | 3.55pm, Sunday 4th August, 2019 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
After a brief piece of asphalt at the railway access point, the path reverts to a soggy soft surface for the unexpectedly steep climb.
Comments reflect the views of the original submitter only.